A building auditor kneels with a torch on the broken floor of an unfinished apartment while a family with moving boxes waits at the door, painted in late synthetic cubism

Code and compliance

The NSW Building Defects Library for NCC 2022 and 2025: All 40 Defects, in Five Guides

Building Commission NSW's Building Defects Library lists 40 defects its auditors find often on apartment sites. Here they are by building element, each with its NCC 2025 and NCC 2022 clause and the stage where it is cheapest to catch.

Since September 2020 Building Commission NSW has audited apartment buildings while they are still going up. Its Building Defects Library collects 40 of the defects those audits keep turning up, chosen because they recur, can be seen without testing, and cost far less to fix before anyone moves in.

This series rewrites the Library in five guides, one per building element. Each defect gets its NCC 2025 clause beside the NCC 2022 one the Library was written against, the stage of construction where it is still exposed, and what to check. This page is the index.

In one minute

  • The Library lists 40 defects in the five building elements of NSW's Design and Building Practitioners Act 2020: waterproofing (10), fire safety (11), structure (7), building enclosure (6) and services (6).

  • Serious defects were reported in 53% of the 520 apartment buildings in the 2025 strata survey, and waterproofing in 44%.

  • The Library was written against NCC 2022. Each defect still breaches a requirement under NCC 2025, some under new clause numbers. The biggest changes are new balcony rules in F1D4, Part F3 moving into Part F1, and a rewritten threshold rule for exits.

  • Which edition applies depends on your state and a date. NSW, Queensland, South Australia and Tasmania are on NCC 2022 until 1 May 2027, and the Northern Territory has not adopted NCC 2025.

  • Every defect has a stage where it is still exposed, and each guide sets out those hold points.

What is the Building Defects Library?

NSW passed two Acts in 2020 that changed how apartment buildings are regulated: the Residential Apartment Buildings (Compliance and Enforcement Powers) Act, which lets the regulator stop work and order defects fixed before an occupation certificate is issued, and the Design and Building Practitioners Act, which brought in registration, compliance declarations and a statutory duty of care. Audits of Class 2, 3 and 9c buildings under construction began in September 2020, and the regulator became Building Commission NSW on 1 December 2023.

The auditors found that a small number of defect types made up a large share of what they detected. The Library gathers those that recur, can be recognised without specialist testing or equipment, and cost much more to fix after occupation. It notes that they may not be the most common defect in each element. Each entry sets out the NCC 2022 provision and the Standard it breaches. The first version was written for certifiers, councils and other industry members; version 1.1 (June 2025) revised the building enclosure section, including the damp-proof course requirements for brickwork.

How common are serious defects in new apartments?

Since 2021, strata managers have been surveyed every two years about serious defects in Class 2 buildings of four or more storeys, a sample chosen to match the six-year statutory warranty for major defects. In the 2025 survey, the first led by Building Commission NSW, with Strata Community Association NSW, 53% of the 520 buildings had at least one serious defect in common property (page 10). Where strata managers knew the cost, serious defects had cost an average of A$215,400 per building (page 4).

2023 survey2025 surveyWaterproofing42%44%Fire safety systems24%28%Building enclosure19%23%Structural15%18%Key services14%15%Non-compliant cladding8%2%2023 survey2025 surveyWaterproofing42%44%Fire safety systems24%28%Building enclosure19%23%Structural15%18%Key services14%15%Non-compliant cladding8%2%
Serious defects in common property, by type, as a share of all buildings surveyed (642 in 2023, 520 in 2025). A building can have more than one type. The 2025 survey covered Class 2 buildings of four or more storeys registered from July 2018 to June 2024. From Building Commission NSW, 2025 Strata Defects Report, Figure 4, page 12.

Which NCC edition applies to my project?

The Library was written against NCC 2022. NCC 2025 is published nationally but called up by each state on its own date, and the date that decides is usually when the approval is applied for or issued, not when work starts. Your certifier or building surveyor confirms the edition for a project.

StateIn force on 7 November 2026NCC 2025 fromThe date that decides
NSWNCC 20221 May 2027Construction certificate application made
VICNCC 20251 May 2026Building permit issued
QLDNCC 20221 May 2027Building development application approved
SANCC 20221 May 2027Building consent application made
WANCC 2025 (NCC 2022 may still be used for permit applications made by 30 April 2027)1 May 2026Permit application made
TASNCC 2022 (NCC 2025 applied from 1 May to 4 June 2026)1 May 2027Certificate of likely compliance issued
ACTEither, chosen per projectRequired for approvals from 1 May 2027, unless a DA or works approval was lodged before 1 November 2026Building approval determined
NTNCC 2022Not adoptedBuilding permit granted

Most of the clauses behind these defects are national, but some states have their own versions of them. Each guide lists the state variations to its own clauses.

The 40 defects by building element

ElementDefectsReported in 2025What NCC 2025 changed
Waterproofing1044%NCC 2025 Volume One F1D4 adds balcony rules: a 1:80 fall in the slab itself, an overflow at least 20 mm below the inside slab, a 70 mm step down and a 70 mm hob. Bathroom clauses unchanged.
Fire safety1128%Every clause kept its number. D3D16 now allows a step or ramp at a doorway only where it opens to an external space, C4D10 adds wiring for the stair's pressurisation, and E1D2 also accepts AS 2118.6 or FPAA101H where they apply.
Structure718%B1D4 still calls up AS 3600:2018 and AS 3700:2018. Structural resistance moved into B1P1, which gains reliability indices a year after adoption; B1D2 now allows for the 10-year deflection of the structural substrates under external waterproofing.
Building enclosure623%Part F3 moved into Part F1 (F3D4 is now F1D14, F3D5 is F1D15, F1D6 is F1D8). For these defects the rules read the same; AS 1530.1 moves to its 2024 edition.
Services615%The clause numbers stay the same. F6D6 adds natural ventilation to AS 1668.4, AS 1668.2 moves to its 2024 edition, and E2D12 no longer names one clause of AS 1668.1.

Waterproofing: 10 defects

Five defects on balconies and roofs, where AS 4654.2 governs the membrane, and five in bathrooms, where AS 3740 does. NCC 2025 renumbered Part F1 and wrote balcony falls, overflows, step downs and hobs into the Code; the bathroom clauses read the same in both editions. Read Part 1: waterproofing.

  1. The membrane stops at the outlet
  2. The membrane is not turned into the overflow
  3. Water ponds on the balcony or roof
  4. The surface is not ready for the membrane
  5. The membrane is not terminated at the sliding door
  6. Water ponds on the bathroom floor
  7. Water ponds in the shower
  8. No waterstop at the doorway
  9. The floor waste flange sits proud
  10. The fillet or bond breaker at the wall is wrong

Fire safety: 11 defects

Two defects in fire-rated walls and service penetrations, three in fire doors under AS 1905.1, four in the fire-isolated exits and stairs (services, thresholds, headroom, risers and goings), and two at the hydrants under AS 2419.1. Fire door gaps change when the floor finish goes down, so they are measured after it. Read Part 2: fire safety.

  1. The fire-rated wall stops at the ceiling
  2. Services pass through without tested protection
  3. The fire door does not close and latch by itself
  4. The gaps around the fire door are too big
  5. The fire door frame is hollow
  6. Services run through the fire-isolated stair
  7. There is a step at the stair door
  8. There is not enough headroom in the exit
  9. Risers and goings are not constant
  10. The hydrant outlet points down too steeply
  11. Nothing is kept clear in front of the hydrant

Structure: 7 defects

One masonry defect, an opening with no lintel, and six in concrete: cover and honeycombing, rain on a fresh pour, cut reinforcement, movement joints, slab-on-ground joints and debris. The site checks are the same in both editions; joints are checked against the approved structural plans. Read Part 3: structure.

  1. No lintel over an opening in masonry
  2. Too little cover, exposed reinforcement or honeycombing
  3. Concrete placed in the rain
  4. Reinforcement cut or damaged
  5. A movement joint that cannot move
  6. A slab on ground without the joints on the plans
  7. Debris cast into the concrete

Building enclosure: 6 defects

Four masonry workmanship defects under AS 3700 (damp-proof courses, weepholes and flashings), one at windows and doors under AS 2047, and combustible cladding under C2D10, with the NSW ban on aluminium composite panels. Read Part 4: building enclosure.

  1. The damp-proof course stops short of the face
  2. Weepholes are missing or too far apart
  3. A window or door has no flashing, or the wrong one
  4. Weepholes sit below the level outside
  5. The facade is combustible
  6. A flashing does not project far enough

Services: 6 defects

All six are ventilation and ductwork: a car park jet fan blowing onto the sprinklers or detectors, a room with no ventilation, and four duct defects under AS 4254.1 and AS 4254.2. The survey's key services figure also covers plumbing, electrical services, acoustics and lifts. Read Part 5: services.

  1. A jet fan blows onto the sprinklers or detectors
  2. A room has no ventilation
  3. A flexible duct joint is not airtight
  4. The flexible duct has no compliance label
  5. Rigid duct joints are not sealed
  6. A rigid duct is not properly supported

What does this series add to the Library?

  • Both editions. The NCC 2025 clause sits beside the NCC 2022 one for every defect, with the state variations that affect it.

  • When to catch it. Each guide maps its defects to the inspection where they are still visible, before they are covered up.

  • Drawings and a calculator. Each guide has drawings made for it, with the defects numbered, and a small calculator for one of the checks.

How can AEC Assistant help?

AEC Assistant works from the edition and state of your project, and cites the clauses it relies on.

  • Before construction: upload the drawings to a project and ask it to review the details behind these defects. It marks each issue it finds on the sheet, with the clause.

  • For the site: it builds an inspection and test plan from your specification, with hold points like the ones in each guide.

  • When a defect is found: it turns site photos and notes into a defect register and drafts the direction notice or defect letter, citing the clause for your edition.

Where to read the source

Questions this guide answers

What is the Building Defects Library?

A Building Commission NSW publication (v1.1, June 2025) of 40 defects its auditors find often in Class 2, 3 and 9c buildings under construction, grouped into the five building elements of the Design and Building Practitioners Act 2020, each with the NCC 2022 provisions and Standards it breaches. It was written for certifiers, councils and other industry members.

Does the Building Defects Library apply under NCC 2025?

It was written against NCC 2022. Each of its defects still breaches a requirement under NCC 2025, but some of the clauses behind them have new numbers or new detail: Part F1 was renumbered and absorbed Part F3, NCC 2025 added balcony falls, overflows, step downs and hobs (F1D4), and the threshold rule for exits (D3D16) was rewritten. Each guide in this series gives the NCC 2025 clause beside the NCC 2022 one.

Which defects does the Library cover?

Ten waterproofing, eleven fire safety, seven structural, six building enclosure and six services defects. They were chosen because they recur on sites, can be seen without specialist testing, and cost far less to fix during construction than after occupation. The Library notes they may not be the most common type in each element.

Is the Library only relevant in NSW?

The Library is NSW's, but the NCC clauses and most of the Standards it cites are national. What changes between states is the NCC edition in force and the state variations to some clauses, which each guide in this series notes.