AS 3740:2021 Explained: Scope, Changes from 2010, and How the NCC Calls It Up

AS 3740:2021 Waterproofing of domestic wet areas replaced the 2010 edition in 2021 and is the edition every NCC 2022 and NCC 2025 wet-area provision points at. This guide is for the people who specify, install and certify against it: what the standard covers, what changed from 2010 with clause references, which NCC clause calls it up for your building class, and the numbers you need at hand.

1. Scope

AS 3740:2021 sets minimum requirements for the materials, design and installation of waterproofing to internal wet areas in domestic buildings as defined by the NCC: bathrooms, ensuites, laundries and areas with a basin or a floor waste. It does not cover flooding from plumbing failure or overflowing vessels, concrete admixtures or penetrant sealers used alone, purely decorative coatings, or communal wet areas such as pool changerooms.

The standard is organised in four sections plus six appendices: Section 2 Design, Section 3 Materials, Section 4 Installation, then Appendix A (design considerations and risk categories), B (falls in floor finishes), C (membrane continuity testing, normative), D (a suggested installation checklist), E (compatibility) and F (moisture testing of subfloors).

2. How the NCC calls it up

Building classNCC 2022 (Amendment 2)NCC 2025
Class 1 houses and Class 10Volume Two H4D3, satisfied by ABCB Housing Provisions Part 10.2. Clause 10.2.1 accepts compliance with AS 3740, or the self-contained provisions in 10.2.2 to 10.2.32, or a defined hybrid of the twoUnchanged in substance; Part 10.2 continues to reference AS 3740:2021
Class 2 to 9Volume One F2D2, with Specification 26 setting out which elements must be waterproof or water-resistant. Specification 26 states where; AS 3740 supplies howPart F2 and Specification 26 are retained. The rewritten Part F1 (water management) deals with external membranes, roofs and podiums, not internal wet areas

Two consequences. First, a Class 2 apartment bathroom is not "domestic" for the purposes of the standard's own scope, yet Specification 26 sends you to AS 3740 for installation, so the standard's details apply there too. Second, the edition is fixed by the NCC schedule of referenced documents. A specification that says "AS 3740-2010" on a project assessed under NCC 2022 or 2025 is citing a superseded document.

3. What changed from AS 3740:2010

The preface lists nine changes. In practice they come down to these:

ChangeWhereWhy it matters on site
Three risk categories for wet areasAppendix A.3; used throughout Section 2Category 1 (shower areas and baths with unenclosed showers) is high risk and water must be retained inside it; Category 2 is the floor around a shower with a floor waste; Category 3 has no floor waste and requires an enclosed shower
Shower classification: enclosed, unenclosed Type 1, unenclosed Type 2Clause 2.2Frameless screens and screens with seals are Type 1; curtains, no screen, and screens the spray can pass are Type 2. The type drives the waterstop and extent-of-waterproofing rules
Falls stated per categoryClause 2.3Substrate under the membrane 1:100 minimum where there is a floor waste (2.3.1); shower floor finish 1:80 minimum (2.3.2); Category 2 floor finish 1:100 minimum (2.3.3); a whole bathroom designed as an unenclosed shower needs 1:80 in the substrate (2.3.5)
Unenclosed showers: 1 500 mm extentClauses 2.1.1 and 4.8.2Waterproofing extends at least 1 500 mm from the substrate connection of the shower rose, and the waterstop sits at that line
Vertical membrane terminationClause 4.6.3Shower walls: 1 800 mm above finished floor or 50 mm above the rose, whichever is higher; full height where the rose is ceiling mounted. Hobbed or stepped showers: 150 mm above finished floor or 25 mm above the retained water level. Hobless: 150 mm above the highest finished floor in the shower
Hobless and step-down showers detailedClauses 4.8.3, 4.8.4, 4.15; Figures 4.8.2 and 4.8.4A step-down of at least 15 mm or a waterstop finishing at least 5 mm above the outer floor; screen placement rules for each case
Linear drainsClause 4.3.2; Appendix A.6Connection details for channel drains and four whole-of-bathroom design solutions with linear drains
NichesClause 4.12.4; Figure 4.12.4Lined on all faces with a water-resistant substrate, fillets or bond breakers at every junction, base graded at least 1:100 towards the shower
Hob constructionClause 4.7Hob top falls towards the shower; no timber hobs; joints made flush before the membrane goes on
Membrane inspection and continuity testingClauses 4.5.3 and 4.5.4; Appendix C (normative)Visual inspection before any finish is laid; flood testing to C.2 only after full cure, with the shower and the outer floor tested separately where a hob or waterstop divides them
Compatibility as a systemClause 3.2; Appendix EEvery component from primer to grout must be compatible with the membrane; the "compatibility chain" in Figure E.1 is the checklist
Moisture in subfloorsClause 4.4.3; Appendix FA test method for deciding whether a concrete or timber subfloor is dry enough for the membrane
AS 3740:2021 Figure A.6(B) diagram

Figure A.6(A) — Whole of bathroom example

AS 3740:2021 Figure A.6(A) — Whole of bathroom example diagram

Figure A.6(B) — Whole of bathroom with linear drain

4. Materials: waterproof or water-resistant

Section 3 sorts materials into two groups. Materials deemed waterproof (Clause 3.3.1) stand alone: stainless steel; 99.9% copper to AS 1566; flexible sheet flooring with sealed and welded joints meeting AS/NZS 4858; wet-area membranes meeting AS/NZS 4858; glass to AS 1288; and PVC to AS 3500.2. Everything else in a wet area is at best water-resistant (Clauses 3.3.2 and 3.3.3) and needs a waterproof layer somewhere in the build-up wherever the NCC requires a waterproof element. Our companion article on waterproof versus water-resistant materials works through the lists and the compatibility chain.

5. The numbers to keep at hand

ItemRequirementClause
Shower wall waterproofing height1 800 mm above finished floor, or 50 mm above the rose, whichever is higher4.6.3(c)
Unenclosed shower extent1 500 mm from the rose connection2.1.1, 4.8.2
Fall in shower floor finish1:80 minimum2.3.2
Fall in substrate to floor waste1:100 minimum2.3.1
Fall in Category 2 floor finish1:100 minimum2.3.3
Step-down at shower extremity15 mm minimum4.8.3
Membrane up wall, hobbed or stepped shower150 mm above finished floor or 25 mm above retained water level4.6.3(a)
Niche base fall1:100 towards the shower4.12.4
Bath walls (shower over bath)Waterproof to 150 mm above the bath edge; junctions and penetrations to 1 800 mm above the bath floor4.13.3

The Housing Provisions carry their own figures for a Class 1 house and they are not identical: Part 10.2.12 requires the floor plane to fall to the waste at between 1:80 and 1:50, and 10.2.2 requires shower walls waterproof to not less than 1 800 mm. Where a project uses the Housing Provisions pathway rather than AS 3740, those are the figures the certifier will check.

6. Common errors the standard was written to stop

  • Membrane over a substrate with no fall, so water ponds under the tiles even though the tile surface drains (Clause 2.3.1).

  • A 1 800 mm wall height measured from the tile bed rather than finished floor, or ignored where a rain-head sits higher (4.6.3).

  • Unenclosed showers with the waterstop at the screen line instead of 1 500 mm from the rose (4.8.2).

  • Tiling before the membrane has cured, then flood testing a wet membrane (4.5.2, C.2).

  • A primer, bond breaker or tile adhesive from a different system to the membrane, with no compatibility statement (3.2, Appendix E).

7. Who may do the work

The standard is silent on who holds the trowel; the state licensing regimes are not. Queensland and New South Wales license waterproofing as a trade in its own right, and other states regulate it through the builder's registration and the inspection regime. A waterproofing certificate from the installer, naming the system and the standard, is routine evidence at the pre-tiling inspection and worth specifying on every job.

Check it against the source

AEC Assistant searches the full text of NCC 2025 and NCC 2022 and Australia-wide planning information, resolves the edition in force for the state you are working in, and returns the clause that applies to your project with the source alongside it. Paid plans add deeper knowledge of the standards the code references. Try it free. No credit card.

Sources: AS 3740:2021 (Standards Australia), preface, Sections 2 to 4 and Appendices A, C, E and F; ABCB Housing Provisions Part 10.2; NCC 2022 Volume One F2D2 and Specification 26; NCC 2025 Volume One Part F1. Figures A.6(A) and A.6(B) reproduced for review and commentary. First published 1 September 2026; rewritten with clause references 2 September 2026.

Previous
Previous

Victoria's Townhouse and Low-Rise Code (Clause 55): The Numbers, the Standards and How to Lodge

Next
Next

AS 4000:2025 General Conditions of Contract: What Changed and Why It Matters